TP-LINK T3700G-28TQ Guide d'installation Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
05
Stackable L2+/L3 Managed Switch
Chapter 2 Preparing For Installation
2.1 Package Contents
Make sure that the package contains the following items. If any of the listed items is
damaged or missing, please contact your distributor.
One Power Supply Module
Slot Cover
One Resource CD
One Switch (One PSM150-AC
included)
One Power Cord and one
Console Cable
This Installation Guide
Two mounting brackets and
the ttings
2.2 Safety Precautions
To avoid any device damage and bodily injury caused by improper use, please observe
the following rules.
Safety Precautions
Keep the power off during the installation.
Wear an ESD-preventive wrist strap, and make sure that the wrist strap has a good
skin contact and is well grounded.
Use only the power cord provided with the switch.
Make sure that the supply voltage matches the specifications indicated on the rear
panel of the switch.
Ensure the vent hole is well ventilated and unblocked.
Do not open or remove the cover of the switch.
Before cleaning the device, cut off the power supply. Do not clean it by the waterish
cloth, and never use any other liquid cleaning method.
Site Requirements
To ensure normal operation and long service life of the device, please install it in an
environment that meets the requirements described in the following subsection.
Temperature/Humidity
ȭ
ȭ
Preparing For Installation
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 35 36

Commentaires sur ces manuels

Pas de commentaire